Kitchen area floor tiles

Kitchen area floor tiles

Workmen laying tile flooring

Workmen laying tile flooring of one of the six bedrooms

Barnabas House is making progress.  The floor the one bathroom plumbed and second one has the tub has the tub installed.  Cabinets and doors are being built at the shop.

Carpenters will be doing the finish work soon.

Hallway flooring tile

Hallway flooring tile Mathew and Mike doing the math.


One Comment on “Barnabas House 2009”

You can track this conversation through its atom feed.

  1. Lois says:

    I’d love to have an update posted about the completion of the barnabas house as I have heard it is finished. Maybe some new photos too?